a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

Which of the following best describes the relationship between the employer and the workers in the text?
Describe the graph created by an Ohmic Device on a Voltage vs Current axis?
write the coordinate of the intercept 2 (6y - 4x) = 24 slope m = y-intercept = Please show work.
Erin goes to a pumpkin patch and picks out a pumpkin that weights 4.250 grams. How many kilograms does the pumpkin weigh?
which inequality is shown in this graph
Emily is comparing different discounts offered at a local store. Which statement about the different discounts is true? * 1 point 2/5 = 1. 0.4 = 40% 2. 0.20 = 1
what is momentum equal to
a rectangular deck has a length of 12 feet and a perimeter of 36 feet. what is the width of the deck and what is the area of the deck.
he wrote a letter to passive voice​
A model of the cell cycle is shown here. A student wants to refine the model to include more details about the M phase. Modify the model by selecting the parts