hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

All of the following are true about Latinos’ experiences in World War II EXCEPT (A) unlike African Americans, Latinos fought in integrated units (B) Latino you
An experiment consists of rolling two fair number cubes. What is the probability that the sum of the two numbers will be 8? Express your answer as a fraction in
Who were the British allies and how did they help them to win so many battles in the American Revolutionary
A crime suspect fled the scene when police officers entered the building. How far could he run in 10 minutes if he can run 5 miles per hour?
How do I solve c/4d divided by 3/8d
List the perfect squares between 100 and 500 that are even numbers
What is a scale on a map?
If every positive number has two square roots and you can find the length of the side of a square window by finding a square root of the area, why is there only
Solve the equation x=x+3
What is square root of 126 + square root of 56 in standard form