hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Cory did her best to calm the screaming baby. screaming is highlighted A) noun B) verb C) adjective D) adverb
Who was Robert Oppenheimer?
Which of the following is considered a bronchodilator? a. Acetylcysteine b. Guaifenesin c. Theophylline d. Epinephrine HCL
How did the end of the slave trade in 1808 help draw African Americans to Christian churches
A word starting in tele meaning to speak at a distance
Day and Night Kennel charges $20 per day plus a food fee of $15 to board a pet. Home Away From Home Kennel charges $30 per day plus a food fee of $5. Which syst
This statement is objective: 6:30 a. m. is far too early for school to start. true or false
Help please The Indian leader who advocated a nonviolent approach to independence was _____. Bose Gandhi Nehru Akbar
Which best describes the Muslim presence in north Africa in the late seventh and early eighth centuries
The highlighted word is a/an ________. Persevering is highlighted A) participle B) coordinating conjunction C) gerund D) modal