Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Given that cosθ=x6 . which expression represents θ in terms of x?
¿cómo describe abreu la idea de una orquesta y sus características
Which of the following is the best reason that scientific models are used? (1 point) A They prove scientific theories. B They help visualize things that are
Who is considered to be the ultimate insider, with his name being synonymous with the insider threat issue?
When warm water vapor is blown over land in the water cycle what happens?
The world wide web was originally conceived of as a(n) _____.
Bob's father has 4 children. Momo, Meme, and Mumu are 3 of them. What is the name of the 4th child?
what is the area of a circle with a 5 ft diameter
What is the verb in this simple sentence? My mother sprinkles grated cheese and Italian spices on my spaghetti. A. spices B. mother C. cheese D. sprinkles
In medical problem solving, two steps are key: generating hypotheses and then ruling the incorrect ones out based on data. one difference between experts and no