raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

what do people look for when they skim? a. the length of a document b. the most important information c. the number of subheadings d. the minor details of the d
Does the equation represent a direct variation?if so ,find the content of variations.2x - 4y=0
an elderly man, with very marked features and iron-grey hair, sat in the fifth row of the stalls, on the right-hand aisle. he was a bony man, and the people beh
a source that lists words with similar meanings is called a _____. a. synonym b. persona c. thesaurus d. dictionary
Which characteristic is not used to classify stars? size color distance from Earth age
which figure of speech is the following line from the poem “a red, red rose” by robert burns an example of? o my luve’s like a red, red rose simile metaphor per
Discuss two reasons that people are interested in looking at the connections between films, films and audiences, films and real life, films and academic discipl
chilling is most commonly practiced by
the axiom that allows b(7) to be written 7b.
Identify the​ subject: Take the elevator to the third floor and walk to room 102.