adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

The point (3,7) is reflected in the y axis. What are the coordinates of the transformed point?
what are some physical changes that occur at school? at home ? in nature ?
How do I graph f(x)= -cos(x-pi)?
how many hundredths are in 0.5
11 times 4 and 1 3rds
how do i persuade students to enter the school talent show? i have to write it as an article in the school magazine.
how can temperature can affect communication?
6 metres cost 3.00. what is the cost of 1 metre?
how can you tell the difference between additive comparison and multiplication comparison
Stem-and-Leaf Plots question: How many swimmers were younger then 30 Stem -- Leaf 0 1-- 1 2-- 3,9 3 --