jreedy4403 jreedy4403
  • 02-08-2019
  • Computers and Technology
contestada

In planning for disaster recovery, what is the ultimate goal?

Respuesta :

bbb99
bbb99 bbb99
  • 04-08-2019
Be able to get the systems fully operational with minimum downtime. That means having parallel backups of data but also systems that can be bored up often at a different location
Answer Link

Otras preguntas

Choose the correct sentence from the following options. A. If students return a book past the due date to the library, he or she is fined for it. B. If a stud
a) The bubbles must be negatively charged. b) The bubbles must be positively charged. c) The bubbles must have the opposite charge to the charge on the studen
Studying for an important exam while watching television is not very efficient because it is an example of:
what is the comparison of pretty​
Mount Everest, at 29,028 feet, is the tallest mountain on the Earth. What is its height in kilometers
Promotion is one of the 4P‘s of marketing. The promotion mix is ___??
A research study investigated the impact of start distance from a ball on kicking form and found that kicking patterns change as a function of distance. In this
Before making a turn in an urban area most state laws require a driver to signal at least ____ feet before the turn. a) 50 b) 100 c) 250 d) 500
Evaluate these questions 27(1/3)2
Find the distance between each pair of points. Round to the nearest tenth if necessary. (-3, 6) (2,1)